Project Overview
Columbia Engineering Group provided electrical engineering for a new Washington State Patrol equipment building. The facility protects a high-value, mission-critical asset that had previously faced weather exposure and vandalism risk.
CEG designed the power, lighting, fire alarm, and security systems for the new building. In addition, the electrical infrastructure supports future solar installation.
Protecting a Mission-Critical Asset
The project addressed both physical protection and electrical reliability. Previously, the asset remained exposed to outdoor conditions and potential vandalism.
Therefore, the new building needed dependable power, lighting, life safety, and security systems. CEG also planned for future energy upgrades so the electrical infrastructure could support photovoltaic panels later.
Electrical Engineering Scope of Work
CEG provided a complete electrical design focused on reliable operation, security, life safety, and future flexibility.
Power Distribution
CEG designed the power distribution system to support the building’s operational needs. The team also coordinated utility fault contributions as part of the electrical analysis.
Electrical System Studies
CEG completed fault current analysis, an arc flash study, load calculations, and voltage drop analysis. Together, these studies supported safe and reliable system performance.
Interior & Exterior Lighting
CEG designed LED lighting for both interior and exterior areas. Lighting controls also support efficient operation, visibility, and site security.
Fire Alarm System
The fire alarm system provides early warning and supports life safety within the equipment building. CEG integrated the design with applicable NFPA requirements and WSP protocols.
Intrusion Detection
CEG designed an intrusion detection system to strengthen facility security. The system supports alarm functions and remote monitoring capabilities.
Solar-Ready Infrastructure
CEG designed the electrical infrastructure to accommodate future photovoltaic panels. As a result, WSP can add solar generation later without starting from a completely new electrical approach.
Project Outcome
The new equipment building provides a protected environment for a high-value Washington State Patrol asset. CEG’s electrical design supports reliable power, efficient lighting, life safety, and facility security.
In addition, detailed electrical studies helped support system performance and safety. The solar-ready design also gives WSP greater flexibility for future energy improvements.
As a result, the facility addresses current operational needs while preparing the electrical infrastructure for future upgrades.
What Made This Project Stand Out
The new building protects valuable equipment from weather exposure and vandalism risk.
CEG completed fault current, arc flash, load, and voltage drop studies to support safe and reliable operation.
Fire alarm and intrusion detection systems help protect both the facility and the equipment inside it.
The electrical design allows WSP to add photovoltaic panels as part of a future sustainability upgrade.